Basic Description
Equipped using the zero leak bidirectional checking sole-noid valves, this power unit is made for your operation of two independent circuits. Which are respectively to the principal and subordinate platforms on the double scissors lift. Two cut-off valves are applied for decreasing the machine manually in situation of power reduction. If far more independent circuits are expected to your application please get in touch with us for availability.
Remark: 1. Please check with our income engineer for your diverse pump displacement, motor electrical power or tank capacity.
two. CSA or UL certified motors are available upon request.
Particular Notes
1. The AC motor is of S3 duty cycle, which can only function intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
2. Clean every one of the hydraulic components concerned prior to set up of the energy unit.
3. Viscosity from the oil shoud be 15~46 cst,plus the oil ought to be clean and no cost of impurities,N46 hydraulic oil is proposed.
four. The power unit really should be mounted vertically.
five. Check the oil level while in the tank immediately after the preliminary operating from the power unit.
six. Oil transforming is required immediately after the initial a hundred operation hours,afterwards when every single 3000 hours.