one.A connecting hyperlink of an O-ring Chain for general application is pre-coated with grease at the pins. In advance of connection, confirm the grease within the surfaces of pins, and in case the quantity of grease is compact, apply grease with bare hands. (If gloves are used, the grease will be absorbed by the gloves.)
Example: Once the connecting website link (I) of an O-ring chain for standard application is
shipped, O-rings are fitted in the roots with the pins. If your O-rings come loose due to vibration during transport, refit the O-rings in to the roots of your pins.
In this case, you’ll want to return the grease collected on the roots from the pins to your central surfaces of your pins, a lot more at portion A than at portions B proven in the above illustration. (Portions A is worn due to sliding together with the bushings.)
2.The chain might be most simply connected around the teeth of the sprocket. Engage the links at each ends of the chain with all the sprocket teeth and match connecting pins. In the event the sprocket is usually moved, the chain can also be connected within the loosened side.
3. Connecting process
1.Confirm that O-rings are attached for the roots on the pins.
two.When the quantity of grease applied about the connecting pins is small, coat the pins with grease with the central portions.
three.Insert the connecting pins in to the bushings from the inner hyperlinks at the two ends.
four.Verify that the grease is applied to the entire face of your O-ring, and fit the O-ring onto the connecting pins.
5.Insert the connecting pins in to the connecting plate and while pressing the connecting plate, install the spring clip. Confirm whether the head (the end without a split) on the spring clip is turned in the feeding route on the chain. (See the following illustration.)
6.Make sure you confirm that the spring clip is securely fitted inside the clip grooves on the connecting pins.
This completes jointing from the connecting link. Note that grease over the surfaces of connecting pins and O-rings is usually removed for the duration of set up perform. In this instance, re-grease making use of the grease over the surface from the base chain or the grease within the polyethylene bag in which the connecting link was contained.